Main Page  > Platforms for business  > Top investment sites of the Smolensk Region  > Инвестиционная площадка «Рудня»


Инвестиционная площадка «Рудня»
Location
Smolensk region, Rudnya district, Chistikovskoye rural settlement, near Sherovochi and Dvorishche villages

Сadastral number№1 - 67:16:0020104:518 
№2 - 67:16:0020104:519 
№3 - 67:16:0020104:520 
№4 - 67:16:0020104:521 
№5 - 67:16:0020104:522 
№6 - 67:16:0020104:523 
№7 - 67:16:0020104:524 
№8 - 67:16:0020104:525 
№9 - 67:16:0020104:526 
№10 - 67:16:0020104:527 
№11 - 67:16:0020104:528 
№12 - 67:16:0020104:529 
№13 - 67:16:0020104:530 
№14 - 67:16:0020104:531 
№15 - 67:16:0020104:532 
№16 - 67:16:0020104:533 
№17 - 67:16:0020104:534

Ownership form

State property of Smolensk region

Conditions for granting

- rent; 
- repurchase to the property from auction

Estimated cost of redemption (rent)

initial price of land or annual rent for the land is determined based on the report of an independent appraiser

Area

total area of all land plots - 1005 ha (№1 – 52,2 ha, №2 – 87,2 ha, №3 – 111,3 ha, №4 – 39,6 ha, №5 – 44,0 ha, №6 – 98,7 ha, №7 – 0,1 ha, №8 – 10,8 ha, №9 – 12,3 ha, №10 – 2,1 ha, №11 – 118,3 ha, №12 – 105,5 ha, №13 – 102, 4 ha, №14 – 85,8 ha, №15 – 44,2 ha, №16 – 55, 2 ha, №17 – 1,7 ha)

Land category

Agricultural lands

Relief

Horizontal surface

Presence of objects of amelioration

yes, improved land– plots №1 - №7 (total area of improved lands amounts to 366,65 hectares)

Limitations on use

no limits

Distance to: 

- Moscow                        

- Smolensk



368 hm                        

8 hm

Access to the land plot

- by motor vehicles

A141 highway «Oryol-Rudnya» adjoins the plot

- by railway

Railroad «Smolensk Vitebsk» adjoins the plot

Utilities at the plot

- gas pipeline

High pressure gas pipeline (D 325 mm)

- power lines

110 kV power line

- telecommunications networks
  
The following telephone cables are laid: 
1. Copper cables: KSPP (junction line) – 4 units, TPP-10x2x0.4 - 1 unit, TPP-20x2x0.4 – 2 units, service PRMM-1x2 – 6 units, fiber cable (junction line) – 2 units. 
2. Copper TPP-20x2x0.4 – 2 units, KSPP – 4 units. 
3. Fiber cable

Conditions for connection to utility inftrastructure

- gas supply

Can be connected to Golynki-Rudnya gas pipeline (consumption volume ~ 3,0 ths m3/h)

power supply

To connect the facility for the construction period with power availability class III (construction site capacity 600-800 kW) the following is required: 

- construction of 10 kV power line from VL-1010 of Substation «Rudnya», with the length of 0,5 km;  
- construction of 10 kV power line from VL-1003 of Substation «Rokot», with the length of 2 km; 
- construction of TP-10/0,4 kV; 

To connect the facility with power availability class I (capacity 10 MW) the following is required: 

- construction of 110 kV substation; 
- construction of 22 km 110 kV power line «Rudnya-Golynki»; 
- taps 2 of 1 km each; 
- construction of 10 kV power lines, 2 of 1 km each;; 

To connect the facility with power availability class I (capacity 10 MW) the following is required: 

- construction of 110 kV substation; 
- construction of 80 km 110 kV power line; 
- construction of 10 kV power lines, 6 of 1 km each

- water supply

construction of local facilities is required                       


Рудня.jpg